Skoda Felicia

Since 1994 of release

Repair and car operation



Shkoda Felitsija
+ Cars of mark Skoda Felicia
+ The maintenance instruction
+ Routine maintenance
+ Engine repair
+ Systems of cooling, heating
+ The power supply system
- Engine electric equipment
   + Charge and start systems
   - System of ignition of petrol engines
      The general information
      Diagnostics of malfunctions of system of ignition and check of a condition of its components
      Removal and installation of the coil of ignition
      Removal and installation of the distributor of ignition
      Check and updating of a corner of an advancing of ignition
      Removal and installation of information gauges of system of ignition
   + System of preheat of diesel engines
+ Coupling
+ Transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body and salon furnish
+ Onboard electric equipment


c9b0dd5c

Removal and installation of information gauges of system of ignition

Control systems much of gauges of the engine give out the information used both the power supply system, and ignition system. In the present Section those from gauges which define functioning of exclusively system of ignition are considered only.

The detailed information an obligatory order to other gauges is resulted corresponding Parts of the Head the Power supply system. The gauge of temperature of a cooling liquid, the gauge of temperature/pressure of soaked up air and a potentiometer concern them throttle заслонки with the gauge-switch of stabilisation of turns of idling built in in it.

The detonation gauge

REMOVAL

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.
2. The gauge is established in a back part of the block of cylinders. Access to it from above is extremely limited (in particular on models 1.6). If the gauge is equipped by a thermofilter, прутковым a key turn out a bolt of fastening of the last.

3. Disunite a socket of electroconducting of the gauge of a detonation.
4. Turn out a fixing bolt and remove the gauge.

INSTALLATION

 PERFORMANCE ORDER

Installation is made upside-down. The fixing bolt should be tightened strictly with demanded effort - serviceability of functioning of the gauge depends on it.


The gauge of turns and position of a cranked shaft

System Bosch Mono-Motronic


 PERFORMANCE ORDER

1. The gauge is established from above on картере РКПП.
2. Disunite a 3-contact electric socket located in an arm, fixed on a thermostat casing. Liberate the tip of a socket from an arm.

3. Turn out a fixing bolt and take the gauge from the landing nest in картере transmissions. Check up a working element of the gauge on presence of signs of damages or забрасывания a dirt.


Simos 2P

 PERFORMANCE ORDER

1. Installation is made upside-down. Preliminary carefully clear the gauge of a dirt. A fixing bolt tighten with demanded effort.

2. Procedures of removal and installation of the gauge of turns and position of a cranked shaft in system Simos 2P are similar to that, described for system Mono-Motronic. Unique difference consists that the electroconducting socket in this case is established directly from above on the gauge.


Magneti-Marelli 1AV

 PERFORMANCE ORDER

In the given system the gauge of the Hall which has been built in in assemblage of the distributor is used. As for carrying out of replacement of the gauge it is necessary to disassemble the distributor, performance of the given will charge more correctly to the qualified experts of car-care centre.