Skoda Felicia

Since 1994 of release

Repair and car operation



Shkoda Felitsija
+ Cars of mark Skoda Felicia
+ The maintenance instruction
+ Routine maintenance
- Engine repair
   + Repair without extraction from the car of the petrol engine of 1.3 l
   + Repair without extraction from the car of the petrol engine of 1.6 l
   - Repair without extraction from the car of the diesel engine
      The description of the basic knots and mechanisms
      Reduction of the piston of the first cylinder in position of the top dead point (ВМТ) the end of a step of compression
      Check of tightness of chambers of combustion
      Removal and installation of a belt of drive ГРМ and its covers
      Removal and installation натяжителя and cogwheels of a belt of drive ГРМ
      Removal, installation and adjustment of a tension of a belt of a drive of auxiliary units
      Removal and installation of a cover of a head of cylinders
      Replacement of an epiploon of a camshaft
      Replacement of an epiploon of an intermediate shaft
      Replacement of epiploons of a cranked shaft
      Removal and installation of a head of cylinders in gathering with the inlet pipeline and a final collector
      Check of serviceability of functioning of hydraulic pushers
      Flywheel - removal, check and installation
      Support of the power unit - check and replacement
      The pallet - removal, check and installation
      Removal and installation of the oil pump and assemblage маслозаборника
   + Dismantle of the power unit and engine major repairs
+ Systems of cooling, heating
+ The power supply system
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body and salon furnish
+ Onboard electric equipment


c9b0dd5c

Replacement of epiploons of a cranked shaft

Forward epiploon

 PERFORMANCE ORDER

1. Merge impellent oil (Routine maintenance see the Head).
2. Remove a belt of a drive of auxiliary units (see Has undressed Removal, installation and adjustment of a tension of a belt of a drive of auxiliary units).
3. Remove pulleys of an auxiliary belt and external covers газораспределительного a belt, then result the engine in position ВМТ of the end of a step of compression of the piston of the first cylinder and remove газораспределительный a belt and a cogwheel of a cranked shaft (Sections Reduction of the piston of the first cylinder in position of the top dead point (ВМТ) the end of a step of compression, Removal and installation of a belt of drive ГРМ and its covers see, Removal and installation натяжителя and cogwheels of a belt of drive ГРМ).

4. Drill in a face surface of an epiploon pair of small apertures and screw in them саморезы (try not to damage a wall of a nest and a surface of a pin of a shaft). Having grasped heads of screws flat-nose pliers, take an epiploon from a landing nest.

5. Without applying some any solvents, wipe pure неворсящейся rags of a wall of a nest of an epiploon and a surface of a pin of a shaft. Polish all agnails, teases and the roughnesses, capable to lead to failure of a new epiploon.
6. Grease sponges of a new epiploon and enclose it in a nest in a casing.
7. Hammer blows on оправке suitable diameter, запрессуйте an epiploon in a casing. In quality оправки the face head of the suitable size or a piece of a pipe of the corresponding diameter can be used. Оправка should rest exclusively against firm external edge of an epiploon.
8. Establish into place all components removed with a view of providing of access and adjust a tension of belts (Sections Reduction of the piston of the first cylinder in position of the top dead point (ВМТ) the end of a step of compression, Removal and installation of a belt of drive ГРМ and its covers see, Removal and installation натяжителя and cogwheels of a belt of drive ГРМ).
9. Fill in in the engine necessary quantity of engine oil of a demanded grade.


Replacement of a sealing lining of a casing of a forward epiploon

 PERFORMANCE ORDER

1. Execute the procedures, described paragraphs with 1 on 3, then remove the pallet картера (see Has undressed the Pallet - removal, check and installation).
2. In stages turn out bolts of fastening of a casing of an epiploon.
3. Vrashchatelno-progress accurately remove a casing in gathering with an epiploon from a pin of a cranked shaft.
4. Remove an old lining from an interfaced surface of the block of cylinders. Operating extremely cautiously, smooth out interfaced surfaces of a casing and the block of cylinders, completely having removed from them traces of a material of an old lining (take advantage of a scraper or a penknife).

5. In case of need take from the nest in a casing an old epiploon, accurately having hooked it for this purpose a screw-driver with a flat sting.

6. Carefully wipe a casing and check up it on presence of cracks and deformation signs interfaced surfaces. Lay a casing on a workbench, an interfaced surface downwards. If removed, запрессуйте in a landing nest a new epiploon, having pressed to it wooden брусок and tapping on the last with a hammer.

7. Grease an interfaced surface of the block of cylinders with universal hermetic and press to it a new lining of a casing.

8. Wind a pin of a cranked shaft with an adhesive tape.

9. Grease internal sponges of an epiploon with pure impellent oil, bring casing assemblage to the regular place on the block and vrashchatelno-progress plant it on a pin of a cranked shaft, densely having pressed to the block.

10. Screw bolts of fastening of a casing and in stages tighten them with demanded effort.

Remember that the casing is made of a soft aluminium alloy and can be easily damaged at a non-uniform tightening of bolts.

11. Establish into place the pallet картера (see Has undressed the Pallet - removal, check and installation).
12. Establish into place all other components removed for the purpose of providing of access, do not forget to adjust a tension of belts (Sections Reduction of the piston of the first cylinder in position of the top dead point (ВМТ) the end of a step of compression, Removal and installation of a belt of drive ГРМ and its covers see, Removal and installation натяжителя and cogwheels of a belt of drive ГРМ).
13. In summary fill in in the engine necessary quantity of engine oil of a demanded grade.


Back epiploon

 PERFORMANCE ORDER

1. Execute the procedures described in paragraphs with 1 on 3, then remove the pallet картера (see Has undressed the Pallet - removal, check and installation).
2. Remove from the engine a transmission (the Transmission see the Head).
3. Remove a flywheel (see Has undressed the Flywheel - removal, check and installation), and also a frictional disk and assemblage of a basket of coupling (Coupling see the Head).
4. At a corresponding complete set turn out fixing bolts and remove from the block of cylinders an intermediate plate.
5. In stages ослабьте also turn out bolts of fastening of a casing of a back epiploon.
6. Vrashchatelno-progress accurately remove a casing in gathering with an epiploon from a shaft pin.
7. Remove from the block a lining and smooth out an interfaced surface.
8. The back epiploon varies in gathering with a casing and in an individual order is not delivered.

9. Grease with universal hermetic an interfaced surface of the block and establish on it a new sealing lining of a casing.

10. In the complete set to firm epiploons of manufacture of company Skoda the protective plastic plug is usually delivered, allowing to avoid epiploon damage about edges шпоночного a groove at assemblage putting on on a shaft pin. At installation of an epiploon of not firm manufacturing, wind a pin with an adhesive tape.

11. Grease internal sponges of a new epiploon with pure impellent oil, then vrashchatelno-progress accurately put on assemblage a pin, densely having pressed it to the block.

12. Screw fixing bolts and in stages in regular intervals tighten them with demanded effort.

Remember that the casing is made of a soft aluminium alloy and can be easily damaged at a non-uniform tightening of bolts.

13. Establish the pallet картера (see Has undressed the Pallet - removal, check and installation).
14. Establish a frictional disk and assemblage of a basket of coupling (Coupling see the Head).
15. Establish into place a transmission (the Transmission see the Head).
16. In summary fill in in the engine necessary quantity of engine oil of a demanded grade (Routine maintenance see the Head).